    When a building plan is approved in South Africa, the municipality keeps the stamped original in its building control records - permanently. That means the approved plans for your house, your garage conversion or your boundary wall almost certainly still exist, sitting in a plan room or a digital archive at your local council.

    8 min readUpdated 2026-10-12Registered town planner
    How to Get Copies of Your Building Plans From the Municipality

    Getting a copy is a records request, not an application: you are not asking for approval, only for a copy of a document the municipality already holds. The catch is that plans are released under strict rules, because they show the detailed layout and security features of someone's property.

    This guide explains who may request copies, how the process works in Johannesburg, Cape Town and Tshwane, what it costs, and - critically - what to do when the municipality tells you no plans exist for your property.

    01

    What the municipality actually keeps

    Every municipality with a building control function keeps an archive of approved building plans for the erven in its area. In the large metros these records go back decades - Cape Town and Johannesburg hold plans from the early twentieth century, with older drawings often still on microfilm or aperture cards rather than in a digital system.

    The archive typically holds the approved site plan, floor plans, elevations, sections and the drainage layout, together with the approval stamp and the submission date. What it does not always hold is the structural engineer's details, which are sometimes returned to the applicant after approval.

    A separate record that pairs well with building plans is the Surveyor-General diagram (SG diagram) of the erf, which shows the registered boundaries. The diagram comes from the Surveyor-General's office, not the municipality, but the two documents together answer most 'what exactly is on my property' questions.

    02

    Who is allowed to request copies - and why it is restricted

    Unlike a zoning certificate, building plans are not released to the general public. Councils treat them as restricted records because they reveal the interior layout, security arrangements and services of a private property.

    As a rule of thumb applied across the metros, copies are released to the registered owner of the property, or to a professional - an architect, draughtsperson, town planner or conveyancer - acting with the owner's written authorisation or power of attorney. A prospective buyer will normally need the current owner's consent letter before the council releases anything.

    Expect to produce the erf number, proof of identity, proof of ownership (a recent rates account or title deed) and, where you are acting for the owner, the signed authorisation. Confirm the exact document list with the municipality before you go - counter staff will turn you away over a missing letter.

    03

    How to request plans in Johannesburg

    In the City of Johannesburg, building plan records are held by Building Development Management within the Development Planning department. Requests are made through the regional office that serves your erf, supported by the city's land use and building control customer channels.

    You will complete a plan-copy request form, attach your ID, proof of ownership or authorisation, and pay the prescribed search and copy fee from the current tariff schedule. Copies of older plans may need to be retrieved from off-site or microfilm archives, which adds time.

    Allow anywhere from a few working days for a recent digital plan to several weeks for an archived drawing. Because tariffs and lodgement channels change, confirm the current process and fee on the City's website or at your regional office before submitting - and keep the reference number you are given, as it is the only reliable way to follow up.

    04

    How to request plans in Cape Town

    The City of Cape Town holds approved plans in the records of its Development Management department, with district planning offices across the metro. Requests are lodged through the City's building plan records process - increasingly via the City's online services - by the registered owner or an authorised professional.

    You will need the erf number, owner verification and payment of the prescribed copy fee per plan or per sheet, depending on how the request is captured. Cape Town's archive is unusually deep, and it is common for very old properties to have plans that predate digital systems and must be scanned from film.

    As with Joburg, check the City's current tariff and channel before lodging: the fee for copies is revised in the annual tariffs each July, and the City periodically moves records services between counter and online channels.

    05

    How to request plans in Tshwane

    The City of Tshwane's building plan records sit with its Building Control division under City Planning and Development. Requests are made by the owner or an authorised agent at the relevant building control office, with the erf number, identity documents, proof of ownership or authorisation, and the prescribed fee.

    Tshwane's records cover Pretoria and the surrounding towns absorbed into the metro - Centurion, Akasia, Mamelodi and others - but the depth of the archive varies by former local authority. Properties in the former separate municipalities sometimes have thinner records than central Pretoria erven.

    Confirm the current request channel and tariff with the City before lodging, and if the erf was historically administered by another council, say so up front - it determines which archive the search runs against.

    06

    What to do if the municipality has no plans for your property

    It happens more often than people expect, especially with properties older than sixty or seventy years, with alterations done informally, or where records were lost in municipal mergers. 'No plans on record' does not mean your building is illegal - it means the archive has nothing to give you.

    Your practical options are: first, ask the conveyancing attorney who handled your transfer whether the transfer file holds any plans or diagrams; second, check with previous owners, builders or architects where traceable; third, commission an 'as-built' set, where a draughtsperson or architect measures the existing buildings and draws plans from scratch.

    As-built plans matter because a sale, a bond application or a new building plan submission can all stall when the council has no record of existing structures. If the buildings were erected without approval, that is a separate legalisation process under the National Building Regulations - and it is worth speaking to a professional before volunteering drawings that expose unapproved work.

    07

    What it costs and how long it takes

    Plan copy fees are set in each municipality's annual tariff schedule and are modest - this is a records service, not an application. Expect a search or request fee plus a per-sheet or per-plan copy charge, and confirm the current figure in the municipality's tariff book before paying, as tariffs are revised every July.

    Turnaround is usually days for recent, digitally stored plans and two to six weeks where drawings must be retrieved from microfilm or off-site archives. Requests without a complete authorisation pack are the single biggest cause of delay - submit everything at once.

    One cost people forget: if the plans exist but are faint old blueprints, budget for having them redrawn or scanned at usable quality if you intend to use them for a new submission.

    08

    Where the plans fit into your next step

    Most people request old plans because something bigger is coming: an addition, a second dwelling, a granny flat, a subdivision or a sale. The approved plans tell your draughtsperson what was approved before, and they tell your town planner whether the existing buildings match the current zoning rights.

    If the next step is a new structure or alteration, you will need new building plans drawn and submitted for approval - the old plans are the starting point, not the submission. If the next step is a change of use or more rights than the zoning allows, a land use application (rezoning, consent use or departure) comes before any building plan can be lodged.

    Landlodz's SACPLAN-registered planners work from exactly these records. Once you have your plans - or once you know none exist - we can confirm what your zoning allows, order the official zoning certificate, and prepare and lodge the land use application or coordinate the building plan submission that follows.

    Municipality-specific notes

    • Cape Town

      City of Cape Town building plans lodge via the eServices portal; certificate of occupancy is issued by Building Development Management after inspection sign-off.

    • Johannesburg

      City of Johannesburg lodges building plans through Building Control at the Region Office serving your erf; occupancy certificate issued under the National Building Regulations.

    • Tshwane (Pretoria)

      Tshwane lodges building plans at the Building Control Division. Occupancy certificate issued after final inspection and engineer's certificate.

    • eThekwini (Durban)

      eThekwini lodges building plans via the eThekwini Online Building Plan system. Occupancy clearance issued by the Building Inspectorate.

    Frequently asked questions

    Can anyone get a copy of my house plans?+

    No. Municipalities release building plans only to the registered owner or to a professional acting with the owner's written authorisation or power of attorney, because plans reveal the interior layout and security features of a property.

    How far back do municipal plan records go?+

    In the large metros, many decades - Cape Town and Johannesburg hold records from the early twentieth century. Older plans are often on microfilm or aperture cards and take longer to retrieve than digitally stored recent approvals.

    What if the council says there are no plans for my property?+

    It is common for older properties. Check your transfer file with your conveyancer, ask previous owners or the original builder where possible, or commission an as-built set measured and drawn by a draughtsperson or architect.

    Is a copy of my building plans the same as a zoning certificate?+

    No. Building plans show what was approved to be built. A zoning certificate states what the land may legally be used for under the town planning scheme. Sales, bonds and land use applications often require both.

    Can I use the old plans to build an extension?+

    No - any new structure or alteration needs newly drawn plans submitted and approved under the National Building Regulations. The old approved plans are the reference your draughtsperson works from, and they show what is already lawful on the erf.

    Do I need a town planner to request plans?+

    No - a records request is something you can do yourself as the owner. A planner becomes relevant at the next step: confirming what your zoning allows, ordering the zoning certificate, or preparing a rezoning, consent use or departure application before new plans are lodged.

    Keep reading

    Read time

    Book a free consult. A SACPLAN-registered town planner confirms the route for your erf and sends you a fixed quote before you commit.