When an SDP is required
Conditions of rezoning, group housing approval, township establishment approval, and most General Residential and Business zonings.
What an SDP must include
Site layout to scale, all proposed buildings with floor areas and heights, access, parking and turning, stormwater, refuse, landscaping, internal services, fencing and signage.
Approval process
Lodge with the municipal planning department; circulated to engineering, environment, traffic and heritage; decision typically within 60-90 days.
What goes into an SDP - the full checklist
A municipally compliant Site Development Plan is not a sketch. Every SPLUMA-aligned council requires the same information set, drawn to scale (1:200 or 1:500), signed by a registered architect or town planner.
Mandatory elements: site boundaries with erf number and dimensions; existing and proposed buildings with footprints and floor counts; street and lateral building lines; coverage and FAR calculation; building heights in storeys and metres; vehicular and pedestrian access; parking layout meeting the scheme ratio; service yards, refuse rooms, fire access; landscaping and on-site stormwater management; existing and proposed services connections; locality map and north arrow.
Optional but strongly recommended for approval: 3D visualisation, shadow studies, traffic impact summary, neighbour interface treatment.
When an SDP is mandatory
An SDP is required at the building plan stage for any development above a single dwelling house, and at the land use application stage for every rezoning, consent use and subdivision over 2 dwelling units.
Cape Town, Joburg, Tshwane and eThekwini all require an SDP as part of the intake pack for: group housing, residential buildings (flats), retirement villages, business and commercial buildings, schools, places of worship and any consent use involving alterations.
We lodge it for you
Landlodz prepares and lodges site development plans with the municipality. Book a free consult and a planner will confirm what your approval requires.
Municipality-specific notes
Cape Town
City of Cape Town uses the Municipal Planning By-Law (MPBL, 2015) and the Development Management Scheme (DMS). Applications run through the eDevelopment Application Management System (eDAMS).
Johannesburg
City of Johannesburg operates under the Municipal Planning By-Law (2016) and the Joburg Town Planning Scheme. Applications lodge via the JoziPlan online portal.
Tshwane (Pretoria)
City of Tshwane uses the Tshwane Town-planning Scheme (2008) under the Land Use Management By-Law. The Spatial Planning division handles intake.
eThekwini (Durban)
eThekwini uses the eThekwini Town Planning Scheme administered under the KwaZulu-Natal Planning and Development Act and SPLUMA.
Frequently asked questions
Is an SDP the same as a building plan?+
No. The SDP is the town planning layout. The building plan is the detailed construction drawing approved by building control.
How much does an SDP cost?+
Costs depend on lot size and complexity. Landlodz coordinates the SDP with the responsible architect or planner as part of the application fee published on the Landlodz pricing page.
Who signs an SDP?+
A registered architect (SACAP) or a registered town planner (SACPLAN). The signature is what makes the SDP legally acceptable to the council.
Keep reading
Read time- Guide 01
Rezoning Applications in South Africa: The Complete 2026 Guide
Rezoning is the most powerful land use application route. Here is every step, from feasibility to gazette notice to final approval.
12 min - Guide 02
Subdivision Applications in South Africa
Subdividing land creates two or more new erven from one. Here is every step from town planning approval to deeds registration.
11 min
Book a free consult. A SACPLAN-registered town planner confirms the route for your erf and sends you a fixed quote before you commit.