Pretoria · Gauteng · SPLUMA

    Consent Use application in Pretoria.

    A consent use is permission to carry on one specific additional activity on a property without changing its underlying zoning. The land use scheme itself lists the activity as something the municipality may allow in that zone at its discretion - a guest house, a place of instruction, a home enterprise - and the application asks the municipality to exercise that discretion for your property.

    City of Tshwane - Group Spatial Planning · Section 16(2) - Consent / special consent in terms of the zoning scheme

    R 25 800Landlodz fee
    City of Tshwane - Group Spatial PlanningLodged with
    Consent UseApplication

    What it is

    Understanding a consent use

    Land use schemes distinguish between uses that are permitted as of right in a zone, uses that are permitted only with the municipality's consent, and uses that are prohibited outright. A consent use application deals only with the middle category. The zoning does not change; a right to conduct the named activity is granted on top of it, usually subject to conditions covering hours, intensity, parking, signage and neighbour impact.

    Typical cases are a guest house or short-stay accommodation in a residential zone, a crèche or place of instruction, a place of worship, a home office or home enterprise, or a small shop in a residential area. The threshold question is always the same: does the scheme list this use as a consent use in this zone? If it does not, no consent application is possible and the route is a rezoning.

    The consent right is generally narrower and more conditional than a zoning right. It can lapse if the use is not commenced within a stated period or if it stops, it can be tied to the applicant rather than running freely with the land in some schemes, and it can be withdrawn where conditions are breached. That is the trade-off for a process that is usually faster and materially cheaper than a rezoning.

    The Spatial Planning and Land Use Management Act 16 of 2013 (SPLUMA) is the national framework: it requires every municipality to adopt its own land use scheme and municipal planning by-law, and it makes the municipality - not the province - the authority of first instance on land development applications. Consent uses are granted under the scheme provisions of the municipal planning by-law. Public notice to affected neighbours is still normally required, and objections must be considered before a decision.

    Consent use vs rezoning vs departure

    Three different things are at stake. A consent use adds a permitted activity inside the existing zone. A rezoning changes the zone. A departure changes neither the zone nor the use - it relaxes a single development rule such as a building line or coverage. If your problem is 'the scheme does not allow what I want to do here', you need a consent use or a rezoning; if your problem is 'the use is fine but the building does not fit the rules', you need a departure.

    Legal basisThe consent-use provisions of the applicable land use scheme, adopted under the municipal planning by-law in terms of SPLUMA (Act 16 of 2013).

    Pricing

    Consent Use in Pretoria

    What's included

    Planner intake, SPLUMA-aligned motivational report, full document pack, municipal liaison and lodgement with City of Tshwane - Group Spatial Planning.

    Landlodz fee

    from R 25 800

    Landlodz preparation and lodgement. The City of Tshwane - Group Spatial Planning application fee is charged separately per its gazetted tariff schedule. Landlodz is not VAT-registered, so no VAT is added.

    We hold no sourced tariff figure for a consent use in Pretoria, so we publish none - statutory fees are never estimated. Your planner confirms the exact City of Tshwane - Group Spatial Planning tariff before lodgement.

    Local detail

    What's specific to Pretoria

    • The Tshwane Land Use Scheme, 2024 replaced the 2008 scheme, so zoning descriptions taken from older reports or title documents may cite superseded categories.
    • Tshwane runs an online applications register through the e-Tshwane portal, which makes the status of a lodged application traceable.
    • We have not yet sourced the City of Tshwane 2026/27 tariff schedule, so we publish no statutory fee figure for Tshwane - your planner confirms it with the City before lodgement.

    Who it's for

    Built for serious applicants

    Owners running a guest house or short-stay accommodation from a residential property

    Schools, crèches, and places of worship in residential areas

    Home-based professional offices and small enterprises

    How it works

    From search to municipal submission

    01

    Planner intake

    Our planner confirms this on the intake call: Confirm the property's zoning supports the use as a consent right.

    02

    Submit intake

    Describe the proposed use, hours, intensity, parking, and impact.

    03

    Feasibility review

    Our planner reviews the proposal against SPLUMA and the local by-law and flags risks before drafting.

    04

    Pay & generate

    Receive your motivational report and consent application pack.

    05

    Planner review & submit

    A registered planner finalises and lodges the application.

    Submission pack

    Documents for a consent use in Pretoria

    Taken from the City of Tshwane Land Use Management By-law, 2016 form set published by City of Tshwane (last checked 2025-04-01). Our assigned planner confirms the final pack against the municipality's current application form before lodgement.

    Application Form (Annexure E)
    Power of Attorney (if applicable)
    Title Deed (with all conditions)
    SG Diagram
    Locality Plan
    Site Development Plan (1:500)
    Zoning Certificate
    Public Participation Affidavit + proof of notice
    Bondholder Consent (if mortgaged)
    Engineering Services Report
    Traffic Impact Assessment (where applicable)

    Cost breakdown

    Consent Use cost in Pretoria

    What you pay for a consent use lodged with City of Tshwane - Group Spatial Planning, split between the statutory municipal fee and the Landlodz preparation fee.

    Municipal application fee (City of Tshwane - Group Spatial Planning)

    Confirmed at quotation

    Set by City of Tshwane - Group Spatial Planning's own gazetted tariff schedule and charged directly by the municipality. We don't publish an estimate - our planner confirms the exact tariff before lodgement.

    Landlodz preparation & lodgement

    from R 25 800

    Fixed fee covering intake, SPLUMA-aligned motivational report, document pack and municipal liaison.

    Payable to Landlodz

    from R 25 800

    Landlodz is not VAT-registered, so no VAT is added. The municipal fee is billed separately at cost once confirmed.

    Landlodz fee

    from R 25 800

    Landlodz preparation and lodgement only. The City of Tshwane - Group Spatial Planning application fee is charged separately per its gazetted tariff schedule and confirmed by our planner before lodgement.

    Phase-by-phase

    Consent Use timeline in Pretoria

    Typical decision: 120-240 days from acceptance.

    PHASE 01

    Intake & feasibility

    5-10 working days

    Planner intake call, official zoning certificate and title deed review, and feasibility assessment.

    PHASE 02

    Drafting & pack

    7-10 working days

    SPLUMA-aligned motivational report, supporting plans and full submission pack.

    PHASE 03

    Lodgement & public participation

    21-30 days statutory comment

    Lodged with City of Tshwane - Group Spatial Planning; statutory notice and neighbour consultation runs in parallel.

    PHASE 04

    Decision

    60-120 days from acceptance to decision

    City of Tshwane - Group Spatial Planning circulates internally, considers comments, then issues the decision.

    Indicative ranges based on SPLUMA statutory clocks and typical City of Tshwane - Group Spatial Planning processing patterns. Actual timing varies with public participation outcomes and council workload.

    Why Pretoria is different

    Tshwane land use applications follow the City of Tshwane Land Use Management By-Law, 2016 (as amended 2024) and the Tshwane Land Use Scheme, 2024, which superseded the 2008 scheme, in alignment with SPLUMA.

    FAQ

    Common questions

    Do I need a registered town planner for a consent use?

    Most South African municipalities - including Pretoria - require land use applications to be lodged by a SACPLAN-registered town planner. Landlodz works with registered and verified town planners, and every application is reviewed and submitted by a registered planner before it reaches the municipality.

    How much does a consent use application cost in Pretoria?

    The Landlodz preparation and lodgement fee starts from R 25 800. On top of that you pay the statutory City of Tshwane - Group Spatial Planning application fee, which is set by that municipality's gazetted tariff schedule - we don't estimate it, our planner confirms the exact amount before lodgement.

    Are the Pretoria consent use fees fixed?

    Gauteng metros publish their own fee schedules and tend to charge premium rates for higher-density rezonings and township establishments. Landlodz shows the current published tariff for City of Tshwane - Group Spatial Planning only where we hold a verified figure; otherwise our assigned planner confirms it directly with the municipality before lodgement.

    Is VAT charged on the consent use fee?

    Landlodz is not VAT-registered, so no VAT is added to the preparation fee. Statutory municipal fees are charged directly by City of Tshwane - Group Spatial Planning. Your itemised invoice shows every line before you pay.

    What about hidden costs?

    Additional costs may include surveyor, conveyancer, traffic impact, or environmental specialist input depending on the proposal. Our planner flags these in the feasibility review before you commit.

    How long does a consent use take in Pretoria?

    Typical decision: 120-240 days from acceptance. The clock starts the day our planner accepts your application as complete.

    What causes delays in Pretoria consent use applications?

    Gauteng tribunals (MPT) sit on fixed cycles; missing a cycle can add 4-6 weeks to a decision. The most common avoidable delay is incomplete documentation that triggers a request for resubmission.

    Can the Pretoria consent use timeline be sped up?

    City of Tshwane - Group Spatial Planning runs on statutory clocks - they can't be shortened. What you can control is pack quality: a complete, planner-prepared pack avoids the back-and-forth that usually costs 30-60 days.

    When can I lodge building plans?

    Building plans require an approved land-use right. Most owners start architectural work in parallel with the consent use, but only lodge the building plan submission once City of Tshwane - Group Spatial Planning has issued its decision letter and recorded the new right.

    Start your consent use application in Pretoria

    Book a free consult. A SACPLAN-registered town planner checks the zoning of your Pretoria property with the municipality and sends you a fixed quote before you commit.