Guides · Municipal Applications

    Consent Use Applications in South Africa

    Consent use lets you use a property for a purpose that is listed in the zoning scheme as a consent use - meaning permission is required but the zoning itself does not need to change. It is the route used for granny flats, guest houses, home enterprises, places of instruction, religious worship and spaza shops on residential land.

    11 min readUpdated 2026-10-12Registered town planner
    Consent Use Applications in South Africa
    02

    Typical timeline and cost

    Most consent use applications take 4–8 months. The Landlodz fee is from R25 800. The municipal fee is extra: in 2026/27 it is R2,000 in Johannesburg, R3,267 in eThekwini (with a lower rate for a home business, tuckshop, tavern or spaza shop) and R963.26 residential / R1,526.83 non-residential in Ekurhuleni.

    03

    Required documents

    Application form, motivation, site plan, locality plan, surveyor general diagram, title deed, neighbour notification proof, council fee receipt.

    04

    Public notice

    Neighbours are always told, but how depends on the municipality. In Johannesburg a consent use is advertised with a notice on the property and letters to the owners and occupiers of adjoining erven, and objections close 28 days after the site notice goes up (Municipal Planning By-law, 2024, section 19(2)). In eThekwini a special consent is advertised in two local newspapers, on site and to neighbours, with 30 days for objections (sections 32 to 36).

    Municipality-specific notes

    • Cape Town

      City of Cape Town uses the Municipal Planning By-Law (MPBL, 2015) and the Development Management Scheme (DMS). Applications run through the eDevelopment Application Management System (eDAMS).

    • Johannesburg

      City of Johannesburg operates under the Municipal Planning By-Law (2016) and the Joburg Town Planning Scheme. Applications lodge via the JoziPlan online portal.

    • Tshwane (Pretoria)

      City of Tshwane uses the Tshwane Town-planning Scheme (2008) under the Land Use Management By-Law. The Spatial Planning division handles intake.

    • eThekwini (Durban)

      eThekwini uses the eThekwini Town Planning Scheme administered under the KwaZulu-Natal Planning and Development Act and SPLUMA.

    Frequently asked questions

    Is consent use the same as a variance?+

    No. Variance is American terminology. The closest South African equivalent to a variance is a departure - a relaxation of a development parameter, not a permission for an additional use.

    How long does consent use approval last?+

    It depends on the municipality and the conditions of approval. In Johannesburg the City can attach conditions under which the consent lapses, for example if the use is not started or stops (Municipal Planning By-law, 2024, section 19(7)). In Cape Town the City can grant a consent use permanently or for a fixed period, and it lapses after five years if the use has not started (Municipal Planning By-law, 2015, sections 46 and 47).

    Can I run a business from home without a consent use?+

    Some scheme rules allow incidental home offices (e.g. one professional working alone) as a primary right. Anything with employees, walk-in clients or a sign on the gate triggers a consent use application. Confirm against the relevant scheme schedule before assuming.

    What happens if my consent is approved with conditions I can't meet?+

    You can apply for a variation of conditions, lodge a SPLUMA appeal within 21 days, or decline to act on the consent. Doing nothing means the consent lapses after the prescribed period (usually 2 years).