Johannesburg · Gauteng · SPLUMA

    Departure / Relaxation application in Johannesburg.

    A departure is relief from one specific development rule in the land use scheme - a building line, coverage, floor area ratio, height or parking requirement - without changing the zoning or the use. It is the narrowest of the land use applications: everything about the property stays as it is except the single parameter you cannot meet.

    City of Johannesburg - Development Planning · Departure from provisions of the Land Use Scheme

    R 15 480Landlodz fee
    City of Johannesburg - Development PlanningLodged with
    DepartureApplication

    What it is

    Understanding a departure / relaxation

    Schemes distinguish between permanent departures, which permanently relax a parameter for the property, and temporary departures, which allow a use or deviation for a fixed period. Most owner applications are permanent departures, and most of those are building line relaxations - a garage, carport, patio or extension that would otherwise sit closer to a boundary than the scheme permits.

    The decision turns almost entirely on impact on neighbours and on the streetscape: overshadowing, loss of privacy, drainage, and whether the relaxation is consistent with what already exists in the area. Because the affected interests are usually confined to the immediate neighbours, notice is normally limited to them rather than published widely, which is part of why a departure is faster than a rezoning.

    A departure cannot be used to authorise a use the zone does not allow, however small the departure looks on paper. Where a proposal needs both - a use that requires consent and a building that breaches a building line - both applications are required and are usually lodged together.

    The Spatial Planning and Land Use Management Act 16 of 2013 (SPLUMA) is the national framework: it requires every municipality to adopt its own land use scheme and municipal planning by-law, and it makes the municipality - not the province - the authority of first instance on land development applications. The departure provisions themselves sit in the municipality's own planning by-law and land use scheme, so the categories and thresholds differ from one municipality to the next.

    Departure vs removal of restrictions

    A departure relaxes a rule in the municipal scheme; a removal of restrictions removes a condition in the title deed. A building line can be imposed by either, or by both at once, and relief from one has no effect on the other. Establishing which instrument actually imposes the restriction - the scheme or the deed - is the first step, because lodging the wrong application achieves nothing.

    Legal basisThe departure provisions of the land use scheme, under the municipal planning by-law adopted in terms of SPLUMA (Act 16 of 2013).

    Pricing

    Departure / Relaxation in Johannesburg

    What's included

    Planner intake, SPLUMA-aligned motivational report, full document pack, municipal liaison and lodgement with City of Johannesburg - Development Planning.

    Landlodz fee

    from R 15 480

    Landlodz preparation and lodgement. The City of Johannesburg - Development Planning application fee is charged separately per its gazetted tariff schedule. Landlodz is not VAT-registered, so no VAT is added.

    Statutory municipal fee - Johannesburg

    R738

    2026/27 financial year (tariffs approved May–July 2026). Source: City of Johannesburg, Development Planning Fees Schedule 2026/2027 (joburg.org.za). This is a council fee payable to the municipality, not a Landlodz fee, and not a professional fee. Compare municipal fees

    Local detail

    What's specific to Johannesburg

    • Johannesburg levies development contributions separately from the application fee, calculated on the additional impact a development generates rather than as a flat charge.
    • Notice of an application is published in the Provincial Gazette; that publication is charged on top of the lodgement fee.
    • The Municipal Planning Tribunal sits on a scheduled cycle - missing a cycle, rather than the assessment itself, is frequently what extends a Johannesburg timeline.

    Who it's for

    Built for serious applicants

    Owners building closer to a boundary than the building line allows

    Developers exceeding coverage or height by a small margin

    Sites needing relaxed parking or on-site requirements

    How it works

    From search to municipal submission

    01

    Planner intake

    Our planner confirms this on the intake call: Confirm current zoning parameters and the proposed deviation.

    02

    Submit intake

    Specify which scheme provision needs relaxation and by how much.

    03

    Feasibility review

    Our planner reviews the proposal against SPLUMA and the local by-law and flags risks before drafting.

    04

    Pay & generate

    Receive a focused motivational report justifying the departure.

    05

    Planner review & submit

    Registered planner lodges the application.

    Submission pack

    Documents for a departure / relaxation in Johannesburg

    Taken from the City of Johannesburg Municipal Planning By-law, 2016 form set published by City of Johannesburg (last checked 2025-04-01). Our assigned planner confirms the final pack against the municipality's current application form before lodgement.

    Application Form (LUM)
    Power of Attorney (if applicable)
    Title Deed (with all servitudes/restrictions)
    SG Diagram
    Locality Plan
    Site Development Plan (1:500)
    Zoning Certificate
    Notice of Intention (Form A) + proof of advertising
    Bondholder Consent (if mortgaged)
    Engineering Services Report
    Traffic Impact Assessment (if >150 trips/peak hr)
    Environmental Screening Report (if applicable)

    Cost breakdown

    Departure / Relaxation cost in Johannesburg

    What you pay for a departure / relaxation lodged with City of Johannesburg - Development Planning, split between the statutory municipal fee and the Landlodz preparation fee.

    Municipal application fee (City of Johannesburg - Development Planning)

    R738

    Published tariff for the 2026/27 financial year (tariffs approved May–July 2026), charged directly by the municipality. Source: City of Johannesburg, Development Planning Fees Schedule 2026/2027 (joburg.org.za).

    Landlodz preparation & lodgement

    from R 15 480

    Fixed fee covering intake, SPLUMA-aligned motivational report, document pack and municipal liaison.

    Payable to Landlodz

    from R 15 480

    Landlodz is not VAT-registered, so no VAT is added. The municipal fee is billed separately at cost once confirmed.

    Municipal figure transcribed from City of Johannesburg, Development Planning Fees Schedule 2026/2027 (joburg.org.za), 2026/27 financial year (tariffs approved May–July 2026). It is a council fee, not a professional fee, and is payable to the municipality rather than to Landlodz.

    Landlodz fee

    from R 15 480

    Landlodz preparation and lodgement only. The City of Johannesburg - Development Planning application fee is charged separately per its gazetted tariff schedule and confirmed by our planner before lodgement.

    Phase-by-phase

    Departure / Relaxation timeline in Johannesburg

    Typical decision: 120-240 days from acceptance.

    PHASE 01

    Intake & feasibility

    5-10 working days

    Planner intake call, official zoning certificate and title deed review, and feasibility assessment.

    PHASE 02

    Drafting & pack

    7-10 working days

    SPLUMA-aligned motivational report, supporting plans and full submission pack.

    PHASE 03

    Lodgement & public participation

    21-30 days statutory comment

    Lodged with City of Johannesburg - Development Planning; statutory notice and neighbour consultation runs in parallel.

    PHASE 04

    Decision

    60-120 days from acceptance to decision

    City of Johannesburg - Development Planning circulates internally, considers comments, then issues the decision.

    Indicative ranges based on SPLUMA statutory clocks and typical City of Johannesburg - Development Planning processing patterns. Actual timing varies with public participation outcomes and council workload.

    Why Johannesburg is different

    Johannesburg applications fall under the City of Johannesburg Municipal Planning By-Law, 2024, which commenced on 3 April 2024 and repromulgated the 2016 by-law, read with the City of Johannesburg Land Use Scheme, 2018 and SPLUMA.

    FAQ

    Common questions

    Do I need a registered town planner for a departure / relaxation?

    Most South African municipalities - including Johannesburg - require land use applications to be lodged by a SACPLAN-registered town planner. Landlodz works with registered and verified town planners, and every application is reviewed and submitted by a registered planner before it reaches the municipality.

    How much does a departure / relaxation application cost in Johannesburg?

    The Landlodz preparation and lodgement fee starts from R 15 480. The statutory City of Johannesburg - Development Planning application fee is R738 for the 2026/27 financial year (tariffs approved May–July 2026), per City of Johannesburg, Development Planning Fees Schedule 2026/2027 (joburg.org.za), and is charged directly by the municipality.

    Are the Johannesburg departure / relaxation fees fixed?

    Gauteng metros publish their own fee schedules and tend to charge premium rates for higher-density rezonings and township establishments. Landlodz shows the current published tariff for City of Johannesburg - Development Planning only where we hold a verified figure; otherwise our assigned planner confirms it directly with the municipality before lodgement.

    Is VAT charged on the departure / relaxation fee?

    Landlodz is not VAT-registered, so no VAT is added to the preparation fee. Statutory municipal fees are charged directly by City of Johannesburg - Development Planning. Your itemised invoice shows every line before you pay.

    What about hidden costs?

    Additional costs may include surveyor, conveyancer, traffic impact, or environmental specialist input depending on the proposal. Our planner flags these in the feasibility review before you commit.

    How long does a departure / relaxation take in Johannesburg?

    Typical decision: 120-240 days from acceptance. The clock starts the day our planner accepts your application as complete.

    What causes delays in Johannesburg departure / relaxation applications?

    Gauteng tribunals (MPT) sit on fixed cycles; missing a cycle can add 4-6 weeks to a decision. The most common avoidable delay is incomplete documentation that triggers a request for resubmission.

    Can the Johannesburg departure / relaxation timeline be sped up?

    City of Johannesburg - Development Planning runs on statutory clocks - they can't be shortened. What you can control is pack quality: a complete, planner-prepared pack avoids the back-and-forth that usually costs 30-60 days.

    When can I lodge building plans?

    Building plans require an approved land-use right. Most owners start architectural work in parallel with the departure / relaxation, but only lodge the building plan submission once City of Johannesburg - Development Planning has issued its decision letter and recorded the new right.

    Go deeper on this application

    Other applications in Johannesburg

    Departure / Relaxation in nearby municipalities

    Same application type, lodged with the responsible council in Gauteng.

    Departure / Relaxation in South Africa's metros

    Start your departure application in Johannesburg

    Book a free consult. A SACPLAN-registered town planner checks the zoning of your Johannesburg property with the municipality and sends you a fixed quote before you commit.